Trinidad Rig 58

Trinidad Rig 58: A rig you’ll want to work on

At almost 58-metres high, Trinidad Rig 58 is one of the largest rigs in North America. And it’s not only imposing. It’s impressive. The 1,250-kip* rig is loaded with the most technically advanced drilling equipment in the business.

“It’s overwhelming to see the effort of so many produce a rig of this magnitude, with all of its bells and whistles.” – John Glunz, Rig Manager.

“I am honoured to be a part of a project of such technical focus,” said John Glunz, one of the Rig Managers who’ll be in charge of Rig 58. “It’s overwhelming to see the effort of so many produce a rig of this magnitude, with all of its bells and whistles.”

Rig 58, one of Trinidad’s newest rigs, is being built to reach depths over 8,000 metres and will drill natural gas in the Liard Basin, an area being developed to supply proposed LNG (liquefied natural gas) plants on the west coast of British Columbia.

Trinidad Rig 58 - 3

“This rig will attract some elite work in the drilling field. Its size and capabilities are second to none,” said Glunz, who has been in the drilling business for 26 years, 16 of those as a Rig Manager. “I don’t foresee a big turnover in rig workers, as the rig design and long term steady work are a huge attraction.” Continue reading

Behind the scenes of a Trinidad Drilling rig build

On the side of our newest rig, its name is displayed in white letters: “Trinidad Drilling International 601.”Trinidad 601

Rig 601 has truly earned the “International” moniker. En route to its drilling destination in Saudi Arabia, Rig 601 has been from Canada to the U.S. to the United Arab Emirates – all in a matter of months.

In last week’s blog post, Drew Jacobi, the Rig Up Supervisor on Rig 601, explained what makes 601 state-of-the-art (it can move locations quickly and features advanced control and depth-tracking systems). For this week’s post, Jacobi explained how the high-tech machine came to life. Continue reading