Captain Kirk has nothing on this Driller

Trinidad Drilling's Rig 58 in Nisku, Alberta.Shawn McVey’s favourite part of the job is working with technology. So, the fact that he’s a Driller on one of our newest, most advanced rigs is a good fit. Trinidad Rig 58 boasts everything from fully integrated control systems, to its own water purification building, to an enclosed drill floor, to a moving system that allows its backyard to be moved with its centerpiece.

And for McVey, drilling controls are located on a cyber chair that looks like it would be at home on the bridge of the Starship Enterprise.

“Trinidad has given me the training and opportunities to work with the kind of advanced technology that most rig hands don’t get to work with their entire career,” said McVey, who started with Trinidad three years ago on Rig 57, a sophisticated machine in its own right.

We published other blog posts about Rig 58 while it was being built, but it’s been a few months since the nearly 60-metre-tall rig hit the field to drill natural gas in the Liard Basin in northern B.C., so now we want to give you a look at what it’s like to be at the helm of one of the largest rigs in North America.  Continue reading