Trinidad Drilling Rig 56

Rig spotlight: Trinidad Rig 56

After 20 years in the business, we understand each drilling program has its unique challenges. That’s why we’ve designed and upgraded our rigs with features like back-up secondary systems, centralized control systems, moving systems and safety enhancements to drill deeper, longer and more technically challenging wells.

Rig 56, Trinidad’s first 2000 HP rig added to our fleet in 2011, is no exception. Designed with both natural gas and diesel-powered engines, we’re able to adapt the rig’s power source to fit our customer’s drilling programs. Continue reading

The envelope, please: Trinidad 445 wins Golden Drilling Rig Award

Trinidad Rig 445

One of Trinidad’s exploration and production customers in the United States holds its own Drilling Academy Awards every month. Much like Oscar himself, the award is golden for the winning drilling company.

Maybe that’s why they call it the Golden Drilling Rig Award.

In September 2015, when the envelope was torn open, it revealed the winner as Trinidad Rig 445, operating near Midland, Texas, in the Permian Basin.

Continue reading

Captain Kirk has nothing on this Driller

Trinidad Drilling's Rig 58 in Nisku, Alberta.Shawn McVey’s favourite part of the job is working with technology. So, the fact that he’s a Driller on one of our newest, most advanced rigs is a good fit. Trinidad Rig 58 boasts everything from fully integrated control systems, to its own water purification building, to an enclosed drill floor, to a moving system that allows its backyard to be moved with its centerpiece.

And for McVey, drilling controls are located on a cyber chair that looks like it would be at home on the bridge of the Starship Enterprise.

“Trinidad has given me the training and opportunities to work with the kind of advanced technology that most rig hands don’t get to work with their entire career,” said McVey, who started with Trinidad three years ago on Rig 57, a sophisticated machine in its own right.

We published other blog posts about Rig 58 while it was being built, but it’s been a few months since the nearly 60-metre-tall rig hit the field to drill natural gas in the Liard Basin in northern B.C., so now we want to give you a look at what it’s like to be at the helm of one of the largest rigs in North America.  Continue reading

[Photos] 15 beauty shots of Trinidad Drilling rigs

Most roughnecks are proud of the iron they work on. We’re no exception. Our rigs are some of the best in the industry – more than 85 per cent of our fleet is made up of modern, high-performance rigs.

Here’s a peek at some of our favourite shots of rigs in the field and new iron being built in the yard.

Drilling in the field

Take a look at some of our land and barge rigs operating around the world.

This slideshow requires JavaScript.

Continue reading

Rig spotlight: 4 rigs getting ready for Mexico

Trinidad Design and Manufacturing’s headquarters in Nisku, Alberta, has been a flurry of activity this year. Our team there has been busy building new iron. Their current project? Four new rigs for Trinidad’s joint-venture operations in Mexico. When the rigs are finished, they’ll be the tallest in Trinidad’s fleet.

Here’s what you need to know about Trinidad’s new Mexican rigs:

Their names:

Rigs 701, 702, 703 and 704

Where they’ll be drilling:

The new, state-of-the-art rigs will operate in the area around Villahermosa, Mexico, through an international joint venture between Trinidad and Halliburton. The city of Villahermosa is an epicenter for oil and gas activity in Mexico. Continue reading

Trinidad Rig 58

Trinidad Rig 58: A rig you’ll want to work on

At almost 58-metres high, Trinidad Rig 58 is one of the largest rigs in North America. And it’s not only imposing. It’s impressive. The 1,250-kip* rig is loaded with the most technically advanced drilling equipment in the business.

“It’s overwhelming to see the effort of so many produce a rig of this magnitude, with all of its bells and whistles.” – John Glunz, Rig Manager.

“I am honoured to be a part of a project of such technical focus,” said John Glunz, one of the Rig Managers who’ll be in charge of Rig 58. “It’s overwhelming to see the effort of so many produce a rig of this magnitude, with all of its bells and whistles.”

Rig 58, one of Trinidad’s newest rigs, is being built to reach depths over 8,000 metres and will drill natural gas in the Liard Basin, an area being developed to supply proposed LNG (liquefied natural gas) plants on the west coast of British Columbia.

Trinidad Rig 58 - 3

“This rig will attract some elite work in the drilling field. Its size and capabilities are second to none,” said Glunz, who has been in the drilling business for 26 years, 16 of those as a Rig Manager. “I don’t foresee a big turnover in rig workers, as the rig design and long term steady work are a huge attraction.” Continue reading

Behind the scenes of a Trinidad Drilling rig build

On the side of our newest rig, its name is displayed in white letters: “Trinidad Drilling International 601.”Trinidad 601

Rig 601 has truly earned the “International” moniker. En route to its drilling destination in Saudi Arabia, Rig 601 has been from Canada to the U.S. to the United Arab Emirates – all in a matter of months.

In last week’s blog post, Drew Jacobi, the Rig Up Supervisor on Rig 601, explained what makes 601 state-of-the-art (it can move locations quickly and features advanced control and depth-tracking systems). For this week’s post, Jacobi explained how the high-tech machine came to life. Continue reading

Rig spotlight: Trinidad Rig 57

If you’ve been following our blog posts, you probably know by now we’re proud of our fleet of 134 rigs (and growing). We are proud of the advanced technology used to build them, and we are proud of the best-in-the-business crews who operate them safely. Our “Rig spotlight” series is all about – ­to be honest – bragging up these rigs. This week we want to tell you about Rig 57.

The rig:

Rig 57 has been in operation since April 2012. Its Rig Manager, Kevin Dobson, explained that the relatively new rig was built for its current project – SAGD-well drilling south of Fort McMurray, Alta. (SAGD is an acronym for Steam Assisted Gravity Drainage). Continue reading

Rig spotlight: Trinidad Rig 58

There is something unassuming about the name Rig 58. But once you see this rig built, you’ll realize there is nothing unassuming about it. After all, Rig 58 will be one of the largest and most technically advanced land rigs drilling in North America.

“It’s a beast. You will know it’s Rig 58 when you see it.” – Jehad Hamdan, Engineering Manager with Trinidad Design & Manufacturing

Rig 58 is a project currently being undertaken by Trinidad Design & Manufacturing. When it’s finished, it will be the largest in Trinidad’s 134-rig fleet. Jehad Hamdan, Engineering Manager with Trinidad Design & Manufacturing, likened the rig to “a Bentley.” Continue reading