Trinidad Rig 57

Behind the scenes of a Trinidad rig move: Rig 57 heads south

If you’ve been following us on social media, you know our team’s been busy moving one of our Canadian rigs to Midland, Texas. Selected by the customer to make the 3,500 km (2,175 mile) trek because of its unique pad drilling capabilities, Rig 57 just made its debut in the Permian Basin. According to Baker Hughes, it joins half of the active oil rigs in the United States in this play.

Mega pad monster

The 1,500 HP Triple’s moving system is what really sets it apart from other rigs in west Texas. With advanced moving systems on both the center section (the derrick and substructure) and compound, Rig 57 can walk from well-to-well with flexibility and ease. Continue reading

Rig Profile: Trinidad Drilling Rig 100

This week on the blog, we’re introducing our new spin on an old favourite!

Rig 100 holds a special place in the hearts of those that have been with Trinidad since the beginning. Well-known as a 1,500 HP SCR Triple and the first rig in our US fleet, recent upgrades have taken the ten-year-old rig to a whole new level. Currently drilling in the Permian Basin, the new and improved 2,000 HP AC XL (extended lateral) Triple is aiming for depths it wasn’t capable of…until now.

Read on as Ronald Williams, lead engineer on Rig 100’s recent upgrade, explains why this old favourite has people talking.

Trinidad Drilling Rig 100 Continue reading

Trinidad Drilling Rigs T37 and T38 Fox Creek Alberta April 2016

Spotlight on technology: Pad drilling 101 with Wayne Kuzio

This is the first post in Trinidad’s two-part pad drilling series.

Pad drilling is the real meal deal – a real “win-win”. According to Wayne Kuzio (Sr. Field Superintendent, industry veteran and pad drilling advocate), it has a firm place in the future of drilling.

“The benefits of pad drilling are even more important during low commodity pricing. It just makes sense from an efficiency, cost, time and environmental standpoint,” said Kuzio.

“In times like these, reducing costs and time per well is something I think we can all get onboard with.”

Kuzio is responsible for a number of rigs in our Canadian fleet, including Rigs 37 and 38, currently drilling on a pad near Fox Creek, Alberta (pictured below).

In this post, he and a few of his Rig Managers give us a pad drilling 101 crash course to explain how it all works. Continue reading